With the recent drying in of the house, the basement floor slab was poured today. This will pave the way (literally) for the finalization of the HVAC system, followed closely by plumbing rough-ins and then wiring. The pace of things should now pick up again.
In the meantime, as time marches on, mortgage interest rates are on the rise. Our once ideal timing is slipping away, it seems.