With the windows now (mostly) in, ductwork has begun. The upper level floor supplies are set and this photo shows the returns. Main floor ducts are being put in, and the basement will follow. After that: Pipes!
With the windows now (mostly) in, ductwork has begun. The upper level floor supplies are set and this photo shows the returns. Main floor ducts are being put in, and the basement will follow. After that: Pipes!