Today, the majority of the main floor framing was delivered - all but the PSL columns and column bases. The major wet utilities were also completed between the street and the basement - the copper water line and the sewer line.
Backfill /
Bracing for Backfill /
Waterproofing and insulation /
Beautiful weather today as the waterproofing was applied and rigid insulation boards were secured to the below grade walls. Next week will see drain tile, slip sheets and backfill, along with the start of first floor framing.
Foundation Walls, Imprinted /
The 8" thick, poured concrete walls were poured mid-afternoon in perfect weather today. The forms come 8'-4" and 9'-0" high, I was told, and our walls are 8'-6" so the workers set the tops down from the form's upper edges and troweled the final elevation smooth. This will help ensure a gasketed, air-tight seal between the concrete and the wood plate.
Basement Wall Forms /
The reusable aluminum concrete forms were set today, and most of the internal reinforcement has been placed. The pour is scheduled for Monday. The 3 pads on the right are for the screened porch piers.
Concrete! /
Last night's rain didn't amount to enough to delay the footings, and this morning Lorenz Concrete and Cemstone formed, reinforced, pumped, spread, leveled and smoothed the house's footings.
(click on image to advance; 4 images in gallery)
In one of the center footings, I mixed the last of my father's ashes. I'd saved them since Memorial Day 2013 when we spread them in locations that he'd requested. He didn't request what I did this morning, but I'd saved the last ashes for this purpose, not knowing when the time would come. I feel that as much as he is a part of me, I wanted him to be part of this - the first house that I designed for my own family. I think he'd approve.
Although this little memorial will be obscured by insulation, a vapor barrier, and the concrete floor slab, I inscribed his initials and the current year in the corner where his ashes form part of the concrete, and marked it with an agate from his collection.
Design refinements, continued /
This is an initial rendering of the proposed master bath vanity. The cloudy walls to the right are the glazed shower, and I'm not sure why they look all steamy. Not shown is the under-vanity light which would function as a night light and help give the "floating" vanity its floating illusion.
Excavation complete /
The Overview Blueprint /
What are we building here? This:
Shoring /
A requirement for excavation on tighter lots in Minneapolis is shoring. This is a reinforcing line to prevent unwanted settling that could negatively affect immediate neighbors. In this case, it's required on both sides. Steel tubes are pounded down @ 24" o.c., with plywood set behind them as full excavation progresses. Today was the set-and-pound down phase, with full excavation to follow.
After initial backfill, the excess pile height will be cut off a few feet below final grade.
Quick & crunchy erasure of history for you to see /
On Tuesday, the 92-year-old house that formed part of the 52xx Drew Avenue South neighborhood was erased. The power tools used were a CAT backhoe and several dump trucks. According to our Bollig handler, very little of the debris will end up in a landfill. Most of it will be picked apart into various waste streams for any afterlife purposes the materials may serve.
From the point where the first damage was done, it took only 45 minutes for the framed portion of the house to be crumpled and shoved into the basement. By the time I returned to the site 4 hours later, there was nothing left but a smooth excavation pit.
92 years, including who knows how many remodeling and improvements over the decades, erased in less than half a day...
Pre-demolition countdown commencing... /
We are a few days away from demolition. While we can mourn the loss of a 92-year-old small house, we can feel good that we've salvaged just about all that we could out of it. Most material has been sold (via craigslist) or given away - and the list of salvaged material is long! - some has been retained for incorporation into the new house. What's left is a very empty shell with high radon levels and poor insulation. What will replace it will not compare in quality, but we hope it will become integral to the new fabric of the neighborhood as the current home helped define it originally.
Building permit approved! /
Finally.
STILL waiting! /
At some point, it's possible that there will be a blog post celebrating a building permit and a committed construction start date. But that seems to still be somewhere in the future. It's becoming unbelievable to us that the City of Minneapolis can take so long to review a project that surpasses building code requirements and conforms to all zoning code limits, but we seem to have no power to change this. Yesterday, however, I mailed a letter to City Council ward member Linea Palmisano registering our frustration with the process. We'll see if it does any good.
Deconstruction, Incremental and Gross /
We have been slowly dismantling the existing house over the last few months as we anticipate the building permit. The windows and exterior doors will be the last things to be removed for reuse. This video tour was taken on June 16, 2016.